Challenge
The challenge: a permanent multi-storey training facility on a compressed program
The Australian Federal Police needed a purpose-built training facility, fully custom, delivered to a tight program and without the prolonged on-site disruption a conventional three-storey build would carry. The brief was for a permanent building, 1,600 square metres of training space across three storeys, satisfying the full National Construction Code envelope for an assembly-grade facility: Type A fire-resistance levels, sprinkler protection and detection, code egress, accessibility to every storey, acoustic separation, and a structure designed as a genuine three-storey building. The AFP wanted certainty, delivered to a date, with one party accountable end to end.